Tabata Residential Subdivision - ZC 03-05/GPA 04-13/LCPA 03-07/CT 03-06
4 Documents in Project
Summary
SCH Number
2004061093
Lead Agency
City of Carlsbad
Document Title
Tabata Residential Subdivision - ZC 03-05/GPA 04-13/LCPA 03-07/CT 03-06
Document Type
NOD - Notice of Determination
Received
Posted
1/25/2007
Present Land Use
One single-family dwelling and an agricultural field crop operation with a roadside sales stand.
Z: Limited Control (LC)
GP: Residential Low-Medium Density (0-4 du/ac) (RLM)
Document Description
Request for approval of a retroactive one-year extension for a Tentative Tract Map and Hillside Development Permit for the subdivision of a 5.64 acre site into 16 residential lots and 2 open space lots on property generally located on the east side of Black Rail Road, south of Poinsettia Lane, in the Mello II Segment of the Local Coastal Program and Local Facilities Management Zone 20. No changes to the project design have been proposed, and the project design and permit extensions are consistent with MND adopted for the original approvals (CT 03-06/ HDP 04-02, City Council Resolution 2004-338).
Contact Information
Name
Corey Funk
Agency Name
City of Carlsbad
Contact Types
Lead/Public Agency
Phone
Location
Cities
Carlsbad
Counties
San Diego
Cross Streets
Black Rail Road / Poinsettia Lane
Total Acres
5.64
Parcel #
215-080-20, 21, 28
State Highways
5
Railways
NCTD
Airports
McClellan, Palomar
Schools
Carlsbad Unified School District
Waterways
Pacific Ocean, Batiquitos Lagoon, Encinas Creek
Notice of Determination
Approving Agency
City of Carlsbad
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.