Kirker Creek and Dowest Slough Gas Pipeline
Summary
SCH Number
2003049057
Lead Agency
California Energy Commission
Document Title
Kirker Creek and Dowest Slough Gas Pipeline
Document Type
NOD - Notice of Determination
Received
Posted
4/21/2003
Document Description
Installation of two new, eight-inch diameter gas pipelines by using horizontal directional boring under Kirker Creek and Dowest Slough. These pipelines will tie the existing Sacramento River Gathering System and Montezuma pipelines to the Delta Energy Center.
Contact Information
Name
Jeri Zene Scott
Agency Name
California Energy Commission
Contact Types
Lead/Public Agency
Phone
Location
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.