Bridlewood Recycled Water Tank Replacement Project

2 Documents in Project

Summary

SCH Number
2001112015
Lead Agency
El Dorado Irrigation District
Document Title
Bridlewood Recycled Water Tank Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
12/17/2001
Present Land Use
Bass Lake Hills Specific Plan.
Document Description
This project involves construction of a 150-foot diameter, 40-foot high 4-million gallon (mg) steel recycled water tank on a vacant 10-acre parcel at 1,380 feet above mean sea level. The new tank would replace an existing 0.3 mg concrete recycled water tank, which will be demolished and removed. Site access would be via existing roads upgraded with an all-weather surface. Generally, project construction will involve clearing the construction area of vegetation and grading the site to provide a level surface. The tank will be located on the site to avoid tree removal. Construction will commence in spring 2002, and will involve excavators, graders, cranes, and other typical construction equipment. Approximately 250 lineal feet of ductile iron pipe (DIP) will connect the new tank to the existing recycled water distribution system. The tank is expected to be completed in fall 2002.

Contact Information

Name
W. Chris Word
Agency Name
El Dorado Irrigation District
Contact Types
Lead/Public Agency

Location

Counties
El Dorado
Cross Streets
Bass Lake Road
Parcel #
108-120-241
State Highways
US 50
Waterways
Bass Lake, Carson Creek, Marble Creek, Spring Creek, Deer Creek
Township
9N
Range
9E
Section
5
Base
NDB&M

Notice of Determination

Approving Agency
El Dorado Irrigation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.