Los Berros Road/El Campo Road Left Turn Lanes; ED98-409 (C980031E/P12A278)
2 Documents in Project
Summary
SCH Number
2001031085
Lead Agency
San Luis Obispo County
Document Title
Los Berros Road/El Campo Road Left Turn Lanes; ED98-409 (C980031E/P12A278)
Document Type
NOD - Notice of Determination
Received
Posted
6/4/2001
Present Land Use
Agriculture/Agriculture/Agriculture
Document Description
The County of San Luis Obispo is proposing to construct new left turn lanes on Los Berros Road at its intersections with El Campo Road (both north & south). Construction will occur over an approximate three month period. Construction of the left turn lanes will involve widening the roadway to 48 feet to accommodate two 12 foot through lanes, a single 12 foot center left turn lane, and six foot paved shoulders. 1.9 acres of additional permanent right-of-way will be needed for the project. The project also includes the relocation of an existing oil pipeline within the project limits.
Contact Information
Name
Mark Hutchinson
Agency Name
San Luis Obispo County
Contact Types
Lead/Public Agency
Phone
Location
Counties
San Luis Obispo
Cross Streets
Los Berros Road/El Campo Road
Zip
93420
Total Acres
5.0
State Highways
101
Schools
Arroyo Grande High School
Waterways
Los Berros Creek
Township
32S
Range
13E
Base
MDBM
Other Location Info
Nipomo
Notice of Determination
Approving Agency
San Luis Obispo County
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.