Trutalli, David; CUP-00-08/SMP-00-01/RP-00-01
2 Documents in Project
Summary
SCH Number
2000122021
Lead Agency
Humboldt County
Document Title
Trutalli, David; CUP-00-08/SMP-00-01/RP-00-01
Document Type
NOD - Notice of Determination
Received
Posted
3/16/2001
Present Land Use
Agricultural land use; unclassified zoning; agricultural general plan
Document Description
A Conditional Use Permit, Surface Mining Permit, Reclamation Plan and review of financial assurance cost estimates for a surface mining operation involving an upland rock quarry with a proposed total extraction of 151,760 cubic yards of aggregate material over an expected life of 15 years. Up to 19,000 cubic yards of material will be extracted per year. Usable rock product will range from sand and silt to gravel-sized aggregate. The quarry operations will involve excavation, processing with a grizzly, loading and hauling. No crushing, batch processing, blasting or drilling will be conducted on site. Equipment to be used on site includes: an excavator, a free-standing, non-mechanical screen grizzly, water and dump trucks. Rock products will be hauled by 12 to 14 yard dump trucks.
Contact Information
Name
Michael E. Wheeler
Agency Name
Humboldt County Planning Department
Contact Types
Lead/Public Agency
Address
Phone
Location
Cities
Ferndale
Counties
Humboldt
Cross Streets
Wildcat Road/ Camelot Lane
Zip
95536
Total Acres
3.0
Parcel #
101-051-07
State Highways
101
Schools
Ferndale Elementary and High School
Waterways
Eel River
Township
2N
Range
2W
Section
11
Base
HM
Notice of Determination
Approving Agency
Humboldt County Planning Commission
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.