CONNECTOR CHANNEL-TIJUANA ESTUARY TIDAL RESTORATION PROG
Summary
SCH Number
1996104598
Lead Agency
California State Coastal Conservancy
(SCC)
Document Title
CONNECTOR CHANNEL-TIJUANA ESTUARY TIDAL RESTORATION PROG
Document Type
NOD - Notice of Determination
Received
Posted
8/23/1996
Document Description
1ST PHASE INTERTIDAL WETLAND RESTORATION. A 1500 FT LONG CHANNEL WILL BE CONSTRUCTED BETWEEN THE NORHTERN END OF ONEONTA SLOUGH AND THE TIDAL PONDS SOUTHEAST OF THE TIJUANA ESTURARY VISITOR'S CNETER.
Contact Information
Name
JIM KING
Agency Name
STATE COASTAL CONSERVANCY
Contact Types
Lead/Public Agency
Phone
Location
Cities
Imperial Beach
Counties
San Diego
Notice of Determination
Approving Agency
N/A
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.