Otay Mesa Compost Facility - Compostable Materials Handling Facility Permit
35 Documents in Project
Summary
SCH Number
1992101099
Lead Agency
San Diego County
Document Title
Otay Mesa Compost Facility - Compostable Materials Handling Facility Permit
Document Type
NOD - Notice of Determination
Received
Posted
1/12/2024
Document Description
Pursuant to CEQA Guidelines Sections 15162 - 15164, an Addendum to the previously certified EIR has been prepared. The proposed action consists of the issuance of a Full Solid Waste Facility Permit, in the form of a Compostable Materials Handling Facility Permit (SWIS #37-AA-0988), by the San Diego County Solid Waste Local Enforcement Agency which would allow the existing Otay Mesa Compost Facility to (1) receive Food Material, including curbside co-mingled organics, as composting feedstock, (2) increase the maximum permitted daily tonnage from 300 tons per day to 500 tons per day, (3) increase the maximum permitted site capacity from 12,500 cubic yards to 30,000 cubic yards, (4) change the permitted annual capacity from 90,000 tons to 180,000 cubic yards, and (5) utilize an aerated static pile compost process.
Contact Information
Name
Catherine Dean
Agency Name
San Diego County Solid Waste Local Enforcement Agency
Job Title
Supervising Environmental Health Specialist
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
San Diego
Regions
Unincorporated
Cross Streets
Alta Road and Otay Mountain Truck Trail
Zip
92154
Total Acres
7.13
Parcel #
648-040-57
State Highways
SR-11, SR-125
Railways
n/a
Airports
n/a
Schools
n/a
Waterways
Otay River
Notice of Determination
Approving Agency
San Diego County Solid Waste Local Enforcement Agency
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Diego
Final Environmental Document Available at
5500 Overland Avenue, Ste 170, San Diego, CA 92123
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes